Table 68
Expenditure items | 2015 | 2016 | 2017 |
---|---|---|---|
Radiation safety assurance | 817 | 726 | 848 |
Waste water collection and treatment | 512 | 473 | 480 |
Atmosphere air protection and prevention of climate change | 283 | 219 | 209 |
Waste disposal | 172 | 135 | 121 |
Protection and rehabilitation of lands, surface and ground water | 61 | 51 | 56 |
Other activities in the sphere of environment protection | 474 | 502 | 492 |
Total: | 2,318 | 2,106 | 2,207 |
The share of expenses is related to the activities for environment radiation safety assurance (RUB 848 mln). Considerable expenses are related to collection and treatment of waste water (RUB 480 mln).
The share of environment protection expenses of TVEL Fuel Company falls on SGChE JSC, UEIP JSC and ChMP JSC.
In 2017, total amount of payments for negative impact on the environment increased by 69.6% as compared to the previous year and amounted to RUB 11.2 mln.
In the reporting year, there were no non-financial fines and penalties for negative environmental impact of enterprises included in the management system of TVEL FC, no damage was caused to the environment.
In 2017, the amounts of fines increased due to revealed violations in document management in the sphere of environment protection (generally, failure to meet the deadlines for document handling). The specified violations were revealed during the inspections of the State Supervisory Authorities; in 2017, the number of inspections increased as compared to 2016. According to the issued instructions the remedial measures are taken within the specified terms, and the reports are submitted in accordance with the established procedure.
Diagram 55
Table 69
Enterprise | 2015 | 2016 | 2017 |
---|---|---|---|
Ural Electrochemical Integrated Plant (UEIP JSC) | 757.2 | 689.5 | 672.848 |
Siberian Group of Chemical Enterprises (SGChE JSC) | 871.6 | 822.1 | 959.986 |
Chepetsky Mechanical Plant (ChMP JSC) | 236.9 | 189.6 | 170.503 |
Novosibirsk Chemical Concentrates Plant (NCCP JSC) | 141.9 | 164.6 | 159.678 |
Electrochemical Plant (PA ECP JSC) | 62.3 | 59.7 | 64.452 |
Machine-Building Plant (MSZ PJSC) | 88.5 | 83.6 | 72.463 |
Bochvar Institute (VNIINM JSC) | 45.0 | 51.4 | 60.739 |
Angarsk Electrolysis Chemical Complex (AECC JSC) | 77.8 | 16.1 | 15.577 |
Tochmash VPA JSC | 16.5 | 9.1 | 8.887 |
Kovrov Mechanical Plant (KMZ PJSC) | 19.6 | 20.1 | 21.53 |
Uralpribor LLC | 1.0 | 0.0 | 0.0000 |
Moscow Polymetal Plant (MZP JSC) | 0.1 | 0.3 | 0.352 |
Centrotech SPA LLC | 0.0 | 0.0 | 0.0000 |
NRDC LLC | 0.0 | 0.034 | 0.0130 |
EDB-Nizhny Novgorod JSC | 0 | 0 | 0 |
Centrotech JSC | 0 | 0 | 0 |
Total: | 2318.35 | 2106.13 | 2207.03 |
Diagram 56
Diagram 57